|
Author |
Message |
mick968
Member
|
# Posted: 22 May 2015 10:17am - Edited by: mick968
Reply
we have cabin in Southpark area of Colorado.We love cabin and area.When we bought it had finished main level and bedroom loft (1 full bath) unfinished lower (walkout) (was plumbed for bathroom).We originally just used for storage and hangout area.There is a pellet stove as well.Since we have now finished full bathroom and added bedroom.very nice to have 2 full bathrooms and a bedroom (for sure with guest but even the 2 of us) now looking to finish the remainder we did bathroom and bedroom with whatever wood we had but turned out nice but now do I continue the "Hodgepodge" theme(of wood) for remainder (3 walls) or go with one standard covering it is the lower level I kind of like the personality of the different the wood in the bedroom was from a 150 yr old church amazing condition of the wood IMG_1045.JPG
| IMG_9602.JPG
| IMG_9604.JPG
| IMG_9210.JPG
|
|
|
mick968
Member
|
# Posted: 22 May 2015 11:06am
Reply
Upstairs and loft IMG_9204.JPG
| IMG_9196.JPG
| IMG_9502.JPG
| IMG_9510.JPG
|
|
|
mick968
Member
|
# Posted: 27 Jul 2015 09:49pm
Reply
lower level progress DSCN30945.JPG
| DSCN31024.JPG
| DSCN3093.JPG
| |
|
|
|