|
Author |
Message |
groingo
Member
|
# Posted: 4 Apr 2017 10:48am
Reply
For the time being the car charging will be done using grid power from PSE which will give me time to work on plan A which is grid independent car charging. Installation will run under a grand and will be a "temporary connection" which gives me the freedom to locate where I need the power not where PSE tells me I can. The electrician is an interesting fellow and even owns a Baker electric car and once you get through the frumpy exterior you find a wealth of experience he may be willing to share.
Do you believe in KHARMA!
|
|
bldginsp
Member
|
# Posted: 4 Apr 2017 08:17pm
Reply
My karma ran over your dogma.
|
|
groingo
Member
|
# Posted: 4 Apr 2017 09:30pm
Reply
Quoting: bldginsp undefined The end result was something like SPLAT!
|
|
|