Small Cabin

Small Cabin Forum
 - Forums - Register/Sign Up - Reply - Search - Statistics -

Small Cabin Forum / Cabin Construction / How Much Stem wall above Grade
Author Message
Granet
Member
# Posted: 30 Apr 2017 12:16am
Reply 


Hello

I've been trying to find out how much of the concrete stem wall must be above grade. Does anyone know what BC Building code is on that, I've been told 6" and 8".

Thank you

bldginsp
Member
# Posted: 30 Apr 2017 05:59pm
Reply 


Don't know what BC code is on that, but I'd go with the higher number, or more if possible. Even here in this dry climate (central California) I see rot on bottom plates and plywood if there is less than 8" to dirt. Concrete is porous and soaks water upward to a certain extent. Bottom plates and rafter tails are always the first to go, being closest to water.

Borrego
Member
# Posted: 30 Apr 2017 10:20pm
Reply 


Supposed to be 6", but bldginsp is right, the more the better....

Granet
Member
# Posted: 2 May 2017 03:23pm
Reply 


Thank you!

I plan on using icf's, so shouldn't wick like bare concrete, but I will keep your suggestions in mind.

Cheers

Your reply
Bold Style  Italic Style  Underlined Style  Thumbnail Image Link  Large Image Link  URL Link           :) ;) :-( :confused: More smilies...

» Username  » Password 
Only registered users can post here. Please enter your login/password details before posting a message, or register here first.